4.7
Installation in a 19" mounting frame
The 19" mounting frame is for installation of 2 SCALANCE TAP devices in a 19" rack.
NOTICE
Approvals
The approvals according to ATEX, FM, IECEx, UL and UL Haz-Loc were not obtained in
conjunction with this type of installation.
Installation
1. Push the devices into the mounting frame.
2. Press the devices with slight pressure onto the back wall until the spring catch locks in place.
3. Screw the mounting frame in the 19" rack. For the precise dimensions, refer to the section
"Dimension drawings (Page 39)".
4. Connect the power supplies, refer to the section "Power supply (Page 32)".
5. Connect the device to the local network, refer to the section "Properties and functions
(Page 11)".
6. Connect the terminal via as short a cable as possible ≤ 150 mm and a large cross-sectional
area of 1.5 mm² to the functional ground of the system, see section "Grounding (Page 33)
“.
Dismantling
1. Disconnect all connected cables.
2. Loosen the attachment of the mounting frame.
Installation and disassembly
4.7 Installation in a 19" mounting frame
SCALANCE TAP
Operating Instructions, 06/2022, C79000-G8976-C447-03
25
Содержание SCALANCE TAP104
Страница 4: ...Table of contents SCALANCE TAP 4 Operating Instructions 06 2022 C79000 G8976 C447 03 ...
Страница 10: ...Safety notices SCALANCE TAP 10 Operating Instructions 06 2022 C79000 G8976 C447 03 ...
Страница 16: ...Description of the device 3 4 LED display SCALANCE TAP 16 Operating Instructions 06 2022 C79000 G8976 C447 03 ...
Страница 36: ...Upkeep and maintenance SCALANCE TAP 36 Operating Instructions 06 2022 C79000 G8976 C447 03 ...
Страница 38: ...Technical specifications SCALANCE TAP 38 Operating Instructions 06 2022 C79000 G8976 C447 03 ...
Страница 48: ...Index SCALANCE TAP 48 Operating Instructions 06 2022 C79000 G8976 C447 03 ...