If, during "Economy" mode at night, power failures are to be expected, it is
recommended to change RXB/RXL setting parameter "Veto time" (timer function)
from 30 minutes to 0 minutes.
This ensures that, after power-up, the RXB/RXL room controllers will not work in
"Comfort" mode for 30 minutes.
5.2
Start commissioning
5.2.1
Start during initial power-up
The central control unit RMB795B automatically enters the commissioning menu
when the AC 24 V power supply is applied. Note:
•
The control process remains deactivated in the commissioning mode – all
outputs are set to a defined OFF state on central control unit power-up.
•
All internal safety functions of the central control unit are deactivated
After startup, the operator unit displays the
Language
menu. Now, proceed as
follows:
Step
Action
Result
1
Select and confirm the
Language
for
commissioning or operating the plant
using the
OK
knob
The display appears in the
selected language.
2
Select and confirm in the same way the
Time of day
, the
Date
and the
Year
.
The
Commissioning
menu is
displayed. The access level is
set to
Password level.
3
Change to the
Plant type
menu. Path:
Main menu > Commissioning > Basic
configuration > Plant type
A choice of plant types is
offered.
When commissioning the RMB795B central control unit for the first time, follow the
Installation Instructions 74 319 0398 0 (G3140). They are enclosed with the
RMB795B.
Recommendation
Starting
Basic settings
Further procedure