"Setpoint at 0 V" determines the flow temperature setpoint at DC 0 V.
"Setpoint at 10 V" determines the flow temperature setpoint at DC 10 V.
"Limit value" denotes "Limit value for refrigeration demand": Temperatures above
this level are interpreted as no refrigeration demand.
As long as the flow temperature setpoint does not exceed the set limit value,
DC 0 V output signal is issued. If the temperature drops below the limit value, the
corresponding output signal is issued until the setpoint again exceeds the limit
value plus hysteresis of 0.5 K.
Output signal Y (DC 0…10 V) for refrigeration demand must correspond to a flow
temperature setpoint range of 6…13 °C. This limit value should be at 12 °C. The
diagram shows the parameters to be set and the progression of the refrigeration
demand signals:
11
0
10
Y
[ V ]
[°C]
31
21
D
03
7
8
9
10
12
6
2
1
3
13
14
TV
1 Setpoint in °C at DC 0 V.
here 13 °C
2 Setpoint in °C at DC 10 V.
here 6 °C (factory setting)
3 Limit value for refrigeration demand here 12 °C (factory setting)
11.5.4 Communication
Refrigeration demand can be transmitted over the bus to other devices of a
refrigeration distribution zone if communication is activated (see Sec. 13). A "Refrig
zone source" must be defined.
Main menu > Commissioning > Communication > Distribution zones >
Operating line
Range
Factory setting
Refrigeration
distribution zone,
generation side
----, 1…31
----
11.5.5 Functional check / wiring test
For making a functional check during the wiring test, the outputs of the
"Refrigeration demand" function block can be switched directly.
Explanations relating to
the setting values
Diagram relating to the
setting values (example)
Key
Purpose
Setting values