
Siemens Industry, inc.
34
Installation Sequence
The following section illustrates the MD-12HD model. The MD-48HD components are slightly different,
but follow the same procedure.
STEP 1.
Remove top cover screws (4x) and high voltage cover screws (2x)
– provided.
STEP 2.
Locate, mark, and drill wall mounting points (2x
–6x—customer supplied).
The plastic enclosure itself can be used as a template for marking the drill locations on the wall.
If the meter is not available for use as a drill template, a drawing indicating the spacing between mounting
holes can be found in the appendix. The centerline holes are intended for fastening to wall studs. If hollow
wall fasteners are used, the outer 4 mounting points are recommended.
#8 Fastener
Содержание MD-12HD
Страница 1: ...ii Siemens Industry Inc User Guide MD 12HD MD 48HD Networked Metering Systems A6V11564207 ...
Страница 2: ......
Страница 9: ...Siemens Industry inc 8 Alternate Product Configuration MD 12HD C D N Enclosure with Cover Removed ...
Страница 27: ...Siemens Industry inc 26 Configuring Electrical Components using ViewPoint HD ...
Страница 68: ...67 Siemens Industry Inc Menu Navigation ...
Страница 69: ...Siemens Industry inc 68 Communication Navigation ...