![Siemens LOHER CHEMSTAR 1PS2 Скачать руководство пользователя страница 59](http://html.mh-extra.com/html/siemens/loher-chemstar-1ps2/loher-chemstar-1ps2_operating-instructions-and-installation_378987059.webp)
≤ 1000 V
14 mm
≤ 1250 V
18 mm
Values apply at an installation altitude of up to 2000 m.
When determining the required minimum air clearance, the voltage value in the table may be increased
by a factor of 1.1, so that the rated input voltage range is taken into account during general use.
6.2.8
Cable ends with wire end sleeves
Preferably use end sleeves instead of soldering cable ends. Before connecting, correctly clamp
the end sleeve onto the cable to establish a connection capable of conducting current.
WARNING
Securely and reliably clamping and enclosing the end of the conductor
If the end of the conductor is not correctly enclosed by the end sleeve, but is clamped together
with it, then this can lead to overheating. The temperature class of the machine can be
exceeded. This can trigger ignition of an explosive mixture. This can result in death, serious
injury or material damage.
● Insert only one conductor end into each end sleeve. Attach the end sleeve correctly.
6.2.9
Connection with terminal board
Note that for terminal boards with U-shaped terminal clamps, the conductors to be connected
must be placed under the terminal clamps in a U shape. Alternatively, with multi-stranded and
finely-stranded conductors, evenly divide the conductor (into two parts) and lay in a straight
line under the U-shaped terminal clamps.
See sketch!
Image 6-2
Example for conductor connection
Electrical connection
6.2 Connecting
LOHER CHEMSTAR 1PS2
Operating Instructions 08/2016
59
Содержание LOHER CHEMSTAR 1PS2
Страница 2: ...04 08 2016 11 45 V3 00 ...
Страница 12: ...Introduction 1 1 About these instructions LOHER CHEMSTAR 1PS2 12 Operating Instructions 08 2016 ...
Страница 38: ...Preparations for use 4 13 Transport and storage LOHER CHEMSTAR 1PS2 38 Operating Instructions 08 2016 ...
Страница 64: ...Electrical connection 6 2 Connecting LOHER CHEMSTAR 1PS2 64 Operating Instructions 08 2016 ...
Страница 74: ...Start up 7 8 Test run LOHER CHEMSTAR 1PS2 74 Operating Instructions 08 2016 ...
Страница 84: ...Operation 8 11 faults LOHER CHEMSTAR 1PS2 84 Operating Instructions 08 2016 ...
Страница 102: ...Maintenance 9 2 Corrective Maintenance LOHER CHEMSTAR 1PS2 102 Operating Instructions 08 2016 ...
Страница 118: ...Service and Support LOHER CHEMSTAR 1PS2 118 Operating Instructions 08 2016 ...
Страница 120: ...Technical data and drawings LOHER CHEMSTAR 1PS2 120 Operating Instructions 08 2016 ...
Страница 121: ...Quality documents C C 1 EC Declaration of Conformity LOHER CHEMSTAR 1PS2 Operating Instructions 08 2016 121 ...
Страница 122: ...Quality documents C 1 EC Declaration of Conformity LOHER CHEMSTAR 1PS2 122 Operating Instructions 08 2016 ...
Страница 138: ...Quality documents C 2 IECEx certificate LOHER CHEMSTAR 1PS2 138 Operating Instructions 08 2016 ...
Страница 142: ...Index LOHER CHEMSTAR 1PS2 142 Operating Instructions 08 2016 ...
Страница 143: ...AD EC Declaration of Conformity U161 ...
Страница 144: ...Siemens AG Process Industries and Drives Postfach 48 48 90026 NÜRNBERG GERMANY www siemens com drives ...