Wiring and interfaces
ECOFAST Motor Starters
2-6
GWA 4NEB 950 5221-12 DS 02
2.2.2
Power Cables Prefabricated at One End with Han 10E Pin
Fig. 2-3: Power cables prefabricated at one end with Han 10E pin
Pin
Core no.
(7-core)
Core no.
(11-core)
Assignment
1
1
1
Phase L1
2
2
2
Phase L2
3
3
3
Phase L3
4
—
4
Brake (reference potential)
5
—
5
Brake
6
4
6
Winding terminal W2
7
5
7
Winding terminal U2
8
6
8
Winding terminal V2
9
—
9
Temperature sensor (terminal a)
10
—
10
Temperature sensor (terminal b)
PE (yellow/green)
Содержание ecofast 3RK1702-2GB18-0AA1
Страница 1: ...Motor Starter Handbuch Manual 04 2009 ecofast Totally Integrated Automation ...
Страница 2: ......
Страница 12: ...ECOFAST Motorstarter viii GWA 4NEB 950 5221 12 DS 02 ...
Страница 40: ...Montage von Motorstartern ECOFAST Motorstarter 3 8 GWA 4NEB 950 5221 12 DS 02 ...
Страница 58: ...Gerätefunktionen ECOFAST Motorstarter 6 6 GWA 4NEB 950 5221 12 DS 02 ...
Страница 66: ...ECOFAST Motorstarter B 2 GWA 4NEB 950 5221 12 DS 02 B 1 Motorstarter Bild B 1 Maßbild Motorstarter ...
Страница 70: ...Bestellnummern ECOFAST Motorstarter C 4 GWA 4NEB 950 5221 12 DS 02 ...
Страница 74: ...Korrekturblatt ECOFAST Motorstarter GWA 4NEB 950 5221 12 DS 01 ...
Страница 84: ...ECOFAST Motor Starters viii GWA 4NEB 950 5221 12 DS 02 ...
Страница 112: ...Installation of Motor Starters ECOFAST Motor Starters 3 8 GWA 4NEB 950 5221 12 DS 02 ...
Страница 130: ...Device functions ECOFAST Motor Starters 6 6 GWA 4NEB 950 5221 12 DS 02 ...
Страница 138: ...Technical data ECOFAST Motor Starters A 8 GWA 4NEB 950 5221 12 DS 02 ...
Страница 140: ...ECOFAST Motor Starters B 2 GWA 4NEB 950 5221 12 DS 02 B 1 Motor Starter Fig B 1 Motor starter dimension drawing ...
Страница 146: ...ECOFAST Motor Starters GWA 4NEB 950 5221 12 DS 02 ...
Страница 149: ......