Commissioning and diagnostics
ECOFAST Motor Starters
4-4
GWA 4NEB 950 5221-12 DS 01
4.2
Commissioning and starting
Software requirements
Table 4-2: Software requirements for commissioning
Requirements for commissioning
Table 4-3: Requirements for commissioning
Testing the wiring from the motor starter to the motor
With the aid of the addressing and diagnostic unit (Order No.: 3RK1904-
2AB00) you can test the wiring from the motor starter to the motor via the
addressing socket without a PLC by setting the corresponding outputs:
Table 4-4: Testing the wiring from the motor starter to the motor
Further information is provided in the operating instructions for the
addressing and diagnostic unit.
Configuration software used
Explanations
Configuration software for the AS–i master used
(See AS-i master manual)
Action assumed to have been taken
Further information: see ...
1. Motor starter installed
Installation chapter
2. Address set on the motor starter
Installation chapter
3. Supply voltage for the motor starter switched on
4. If appropriate, supply voltage for the load switched on
5. Motor starter configured and parameterized
6. Supply voltage for AS-i master switched on
7. AS-i master switched to RUN operating state
AS-i master manual
Outputs
Control commands (PLC to motor starter)
DO
-
0.
0
Motor CW
[1]: ON
[0]: OFF
1
Motor CCW
[1]: ON
[0]: OFF
2
Brake
[1]: ON
[0]: OFF
3
Trip reset
[
0] –> [1]: ACTIVE
[0], [1]: NOT ACTIVE
0
1
Содержание Ecofast 3RK1 323-2AS54-1AA0
Страница 1: ...Motor Starter Manual 03 2007 ecofast Totally Integrated Automation ...
Страница 2: ......
Страница 12: ...ECOFAST Motor Starters viii GWA 4NEB 950 5221 12 DS 01 ...
Страница 40: ...Installation of Motor Starters ECOFAST Motor Starters 3 8 GWA 4NEB 950 5221 12 DS 01 ...
Страница 58: ...Device functions ECOFAST Motor Starters 6 6 GWA 4NEB 950 5221 12 DS 01 ...
Страница 74: ...ECOFAST Motor Starters GWA 4NEB 950 5221 12 DS 01 ...
Страница 75: ......