Service
494
Unrestricted
SICAM A8000 / CP-8000 • CP-8021 • CP-8022 Manual
DC8-037-2.02, Edition 10.2017
11.2.2 Checks after Startup
Cyclic operation
RY
ER
Error/reaction
Check of the communication connec-
tions
˜
˜
Communication error
•
Communication failure
•
Communication fault
Communication connections set up
(OK)
˜
™
Function check of the I/O Modules over
the TM bus
˜
˜
I/O Module error
•
Periodical information for the open-/closed-
loop control function
•
Diagnosis information
I/O Modules operational (OK)
˜
™
Error
RY
ER
Note
Communication failure
˜
˜
•
Diagnosis
•
Check communication lines
•
Check remote station
Communication error
˜
˜
Diagnosis
I/O Module error
˜
˜
•
Diagnosis
•
Replace system (if internal module)
•
Replace I/O Module (if external module)
Load firmware code
RY
ER
Error/reaction
System element is shut down and the
firmware code is loaded from the SD
card
˜
˜
Initiate startup of the Master Module for
new loaded system elements (protocol
element, I/O Master Module)
˜
˜
startup completed (OK)
˜
™
startup completed (error)
˜
˜
Содержание CP-8000
Страница 10: ...Open Source Software 10 Unrestricted SICAM A8000 CP 8000 CP 8021 CP 8022 Manual DC8 037 2 02 Edition 10 2017 ...
Страница 74: ...Function Packages 74 Unrestricted SICAM A8000 CP 8000 CP 8021 CP 8022 Manual DC8 037 2 02 Edition 10 2017 ...
Страница 468: ...Engineering via SICAM WEB 468 Unrestricted SICAM A8000 CP 8000 CP 8021 CP 8022 Manual DC8 037 2 02 Edition 10 2017 ...
Страница 524: ...Service 524 Unrestricted SICAM A8000 CP 8000 CP 8021 CP 8022 Manual DC8 037 2 02 Edition 10 2017 ...
Страница 556: ...Error Handling 556 Unrestricted SICAM A8000 CP 8000 CP 8021 CP 8022 Manual DC8 037 2 02 Edition 10 2017 ...
Страница 603: ...Use Cases SICAM A8000 CP 8000 CP 8021 CP 8022 Manual Unrestricted 603 DC8 037 2 02 Edition 10 2017 ...
Страница 604: ......