Siemens Industry, Inc.
Building Technologies Division
P/N 315-033035-6
4
TOP
CC-5 TOP THREADED POSTS
CC-2 TOP THREADED POSTS
CC-5 BOTTOM THREADED POSTS
CC-2 BOTTOM THREADED POSTS
POSITION 1
POSITION 3
POSITION 4
POSITION 2
POSITION 1
POSITION 3
POSITION 4
POSITION 2
CAB-MP
Figure 4
Location Of The CC-5 and CC-2 On The Optional CAB-MP
TOP
SLIDE DOWN CARDCAGE UNTIL
FLUSH ON TOP, LEFT, AND BOTTOM
CAB-MP
CC-5
CARDCAGE
CC-2
CARDCAGE
INSTALL TWO 10-32 SCREWS WHEN
ALIGNED WITH THREADED STUDS
Figure 5
Mounting The CC-5 and CC-2 On The Optional CAB-MP