
Maintenance
163
13.
In the Position probes for routine cleaning area, select
Start
.
All probes (SPP, RPP1, and RPP2) move over cuvettes.
14.
At the Operation Panel, select
Prime
,
PRIME 2
,
and then
Execute
to ensure proper
water flow through the probe.
15.
Verify that water is not leaking from the joint connector.
Replacing DPP probes equipped with crash detection
Materials required:
• Probes:
DPP
-equipped for crash detection
(REF 00201578, PN 073-0223-02)
• Phillips screwdriver
• Pliers
• Lint-free towels
Time: 10 minutes
Analyzer mode: STANDBY
BIOHAZARD
Wear personal protective equipment.
Use universal precautions.
1
Dilution Probe (DPP)
Figure 5-31. Dilution probe
Removing the DPP probe cover
1.
Set the analyzer to Standby.
2.
Using a Phillips screwdriver, remove the screws (
1
) that secure the DPP shield to the
analyzer panel.
3.
Push the DPP shield to the right and slowly lift it until it reaches approximately a 90°
angle, then gently lift the tab of the DPP shield and remove.
4.
Unscrew all thumb screws and remove the splash guard protective covers from the
wash cups.
NOTE:
If the system includes an anti-rotation bracket, avoid hitting it while removing
the splash guard protective cover.
Содержание ADVIA 1800
Страница 1: ...11221680 Rev A 2015 12 Operator s Guide ADVIA 1800 Chemistry System ADVIA 1800 Chemistr y System ...
Страница 102: ...102 ADVIA 1800 Operator s Guide ...
Страница 108: ...108 ADVIA 1800 Operator s Guide ...
Страница 182: ...182 ADVIA 1800 Operator s Guide ...
Страница 188: ...188 ADVIA 1800 Operator s Guide ...
Страница 194: ...194 ADVIA 1800 Operator s Guide ...
Страница 198: ...198 ADVIA 1800 Operator s Guide ...
Страница 204: ...204 ADVIA 1800 Operator s Guide ...
Страница 212: ...212 ADVIA 1800 Operator s Guide ...