Example - 33kV Earth Fault on Resistance Earthed Cable Feeder
Figure 7.5.2-1 Earth Fault with load bias for Resistance Earthed System
Circuit Parameters:
33 kV Cable Length
= 7 km
Load prior to Fault inception
= 700 A
Load during Earth Fault
≈
600 A
Circuit Rating
= 800
A
CT
Ratio
=
1200/1
A
Maximum Feeder Earth Fault level = 800 A (two transformers)
Minimum Feeder Earth Fault Level = 400 A (one transformer)
Charging Current per cable
= 4.5 A per km
At the fault point the phase to neutral voltage may not fall significantly and therefore load current will continue to
flow through the radial cable to the load during the earth fault. The load will usually reduce, but the full circuit
rating is used to calculate the fault position on the relay bias characteristic, as this will test the relay setting for the
worst case. At one end of the feeder only the load current will be measured. At the other end the load and the
superimposed fault current will flow.
Содержание 7SR18 Solkor
Страница 1: ...Energy Management 7SR18 Solkor Line Differential Relay Reyrolle Protection Devices ...
Страница 2: ...Siemens Protection Devices Limited 2 ...
Страница 93: ...7SR18 Configuration Guide Unrestricted Page 12 of 12 2015 Siemens Protection Devices Limited ...
Страница 161: ...7SR18 Performance Specification Unrestricted Page 44 of 44 2018 Siemens Protection Devices Limited ...
Страница 179: ...7SR18 Solkor Settings Guide Unrestricted Page 4 of 44 2016 Siemens Protection Devices Limited Typical Menu Structure ...
Страница 221: ...7SR181 Solkor Technical Manual Chapter 4 Page 2 of 80 2016 Siemens Protection Devices Limited ...
Страница 225: ...7SR181 Solkor Technical Manual Chapter 4 Page 6 of 80 2016 Siemens Protection Devices Limited ...
Страница 289: ...7SR181 Solkor Technical Manual Chapter 4 Page 70 of 80 2016 Siemens Protection Devices Limited ...
Страница 291: ...7SR181 Solkor Technical Manual Chapter 4 Page 72 of 80 2016 Siemens Protection Devices Limited ...
Страница 293: ...7SR181 Solkor Technical Manual Chapter 4 Page 74 of 80 2016 Siemens Protection Devices Limited ...
Страница 353: ...7SR18 Commissioning Maintenance Guide Unrestricted Page 54 of 54 2018 Siemens Protection Devices Limited ...