5
05.01
5.3 Technical data
5-127
©
Siemens AG 2012 All Rights Reserved
SIMODRIVE 611 Configuration Manual (PJU) – 02/2012 Edition
S
Rated load duty cycles for FD operation
t
I
I
max
I
n
0.25 s
10 s
Fig. 5-2
Peak current load duty cycle with preload condition
t
I
I
max
I
n
2.65 s
10 s
Fig. 5-3
Peak current duty cycle without preloading condition
S
Rated load duty cycles for MSD–IM and MSD–SRM
t
I
I
max
I
n
I
s6
0.7 I
n
4 min
10 min
Fig. 5-4
S6 load cycle with pre–load condition
t
I
I
max
I
n
I
s6
0.7 I
n
10 s
60 s
Fig. 5-5
S6 peak–current load cycle with pre–load condition
Load duty cycles
5 Power Modules
10.04