Result
The test is passed if the appropriate states relating to the signals are displayed on the test
station computer.
3.5.3
Additional interfaces
Fundamentals
The customer or its representative parameterize and test the communication of selected
interfaces with their own test equipment. Factory personnel are available to operate the test
station. The interface test is limited to four hours.
Test procedure
1. Using his own test equipment, the customer establishes the hardware connection to the
drive.
2. Factory personnel switch on the auxiliary voltage.
3. The customer establishes the software connection to the drive.
4. The customer parameterizes and tests the communication of selected interfaces.
Result
The interface test has been completed after four hours.
Tests
3.5 Interface test
SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11
36
Reference Manual Rev.201902141423 GL150 wassergekühlt
Содержание 6SL3855
Страница 2: ...14 02 2019 14 23 V8 00 ...
Страница 38: ...Index SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 38 Reference Manual Rev 201902141423 GL150 wassergekühlt ...
Страница 39: ......
Страница 42: ......
Страница 44: ......