Installation and removal
4.5 Installing on the S7-300 standard rail
SCALANCE S615
Operating Instructions, 10/2022, C79000-G8976-C389-07
39
4.5
Installing on the S7-300 standard rail
Installation
1.
Place the second housing guide of the device on the top edge of the standard rail
①
.
2.
Press the device down against the standard rail until the spring catch locks in place
②
.
3.
Connect the power supply, refer to the section "Power supply (Page 51)".
4.
Fit the connectors for the digital input and digital output, refer to the section "Digital
input/output (Page 53)".
5.
Connect the device to the local network, refer to the section "Ethernet port (Page 55)".
6.
Connect the terminal with as short a cable as possible ≤ 150 mm and a large cross
-sectional
area of 1.5 mm² to the functional ground of the system, see section "Terminals (Page 25)“
and section “Grounding (Page 52)“.
Dismantling
1.
Disconnect all connected cables.
2.
Using a screwdriver, pull down the catch on the rear of the device.
3.
Remove the device from the standard rail.