Commissioning
7
7.1
Preconditions
For commissioning, you need a PC that fulfills the following precondition:
• PRONETA Basic or an alternative application must be installed
You can find PRONETA in your SIMATIC installation or as a free download on the pages of the
Siemens Industry Online Support.
Note
PRONETA
Setup using PRONETA is described in these operating instructions as an example.
7.2
Connecting the camera
Preconditions
• The camera has been connected to the power supply via the combination interface.
• PRONETA is installed.
Table 7-1
Steps to be taken for first commissioning
Step
Activity
1
Connect the camera and PC/programming device using an Ethernet cable
2
Switch on the power supply
3
• Select a network adapter
• Configure the Ethernet connection between the camera and PC
4
Start Web Based Management (WBM)
Step 1: Connect the camera and PC using an Ethernet cable
Connect the camera directly to your PC/programming device using an Ethernet cable.
Note
No crossover cable necessary
You do not need a crossover cable because the camera is capable of auto-crossing and
automatically detects the type of cable you are using.
SIMOCRANE CenSOR
Operating Instructions, 07/2021
49
Содержание 6GA7202-2AA10-1BF1
Страница 2: ......
Страница 8: ...Table of contents SIMOCRANE CenSOR 6 Operating Instructions 07 2021 ...
Страница 10: ...Introduction SIMOCRANE CenSOR 8 Operating Instructions 07 2021 ...
Страница 62: ...Commissioning 7 3 Setting up the camera SIMOCRANE CenSOR 60 Operating Instructions 07 2021 ...
Страница 142: ...Technical data 11 5 Retro reflective reflector 500x500 SIMOCRANE CenSOR 140 Operating Instructions 07 2021 ...
Страница 158: ...Appendix A 3 Standards and certifications SIMOCRANE CenSOR 156 Operating Instructions 07 2021 ...
Страница 168: ...Index SIMOCRANE CenSOR 166 Operating Instructions 07 2021 ...