8.7.3
Avoidance of damage to roller bearings during stoppages
Extended stoppages at the identical or almost identical resting position of the roller bearings
can lead to damage such as brinelling or corrosion, for example.
● During stoppages, regularly start the machine up for a brief period once a month. As a
minimum, rotate the rotor several times.
If you have uncoupled the machine from the driven machine and secured the rotor with a
rotor shipping brace, then remove this before turning the rotor over or starting the machine
up.
Make sure that the resting position of the roller bearings after the rotor has been turned
over is different from what it previously had been. Use the fitted key or the coupling halves
as reference markers.
● During re-commissioning, refer to the information in the "Commissioning" section.
See also
Start-up (Page 73)
Greasing the roller bearings prior to commissioning (Page 76)
8.7.4
Shaft grounding brushes (option)
With non-encapsulated and non-sealed shaft grounding brushes, rust may form on the
brushes' running surface on the shaft after extended breaks in operation.
WARNING
Live parts
If the shaft grounding does not function correctly, the shaft can be at a high voltage level that
does not decay quickly enough when the machine comes to a standstill. This can lead to
death or serious injury as a result of electric shock, or bearing damage caused by current
flowing through the bearing.
● Regularly inspect the shaft grounding brushes and replace them if necessary.
● Keep the brushes' running surface clean: Regularly inspect the brushes' running surface
and remove any rust before starting the machine up.
8.7.5
Measurement of the insulation resistance after an extended stoppage
Measuring the insulation resistance and polarization index (PI) provides information on the
condition of the machine. It is therefore important to check the insulation resistance and the
polarization index at the following times:
● Before starting up a machine for the first time
● After an extended period in storage or downtime
● Within the scope of maintenance work
Operation
8.7 Stoppages
SIMOTICS TN Series N-compact 1LH8
Operating Instructions 06/2017
85
Содержание 1PQ8
Страница 2: ...06 06 2017 10 16 V15 00 ...
Страница 80: ...Start up 7 8 De energizing SIMOTICS TN Series N compact 1LH8 80 Operating Instructions 06 2017 ...
Страница 92: ...Operation 8 10 faults SIMOTICS TN Series N compact 1LH8 92 Operating Instructions 06 2017 ...
Страница 112: ...Maintenance 9 2 Corrective Maintenance SIMOTICS TN Series N compact 1LH8 112 Operating Instructions 06 2017 ...
Страница 128: ...Disposal 11 4 Disposal of components SIMOTICS TN Series N compact 1LH8 128 Operating Instructions 06 2017 ...
Страница 130: ...Service and Support SIMOTICS TN Series N compact 1LH8 130 Operating Instructions 06 2017 ...
Страница 134: ...Quality documents SIMOTICS TN Series N compact 1LH8 134 Operating Instructions 06 2017 ...
Страница 139: ......