![Siemens 1NB1402-2AA84-4CA0-Z Скачать руководство пользователя страница 89](http://html.mh-extra.com/html/siemens/1nb1402-2aa84-4ca0-z/1nb1402-2aa84-4ca0-z_operating-and-installation-instructions_378967089.webp)
9.3.3
First service after installation or repair
● Check after approx. 500 operating hours, but after not more than one year:
Check
When the
motor is
running
At stand‐
still
The electrical parameters are maintained.
X
The permissible bearing temperatures are not exceeded.
X
The smooth running characteristics and machine running noise have not
deteriorated.
X
The foundation has no cracks or indentations. (*)
X
X
(*) You can perform these checks while the motor is at standstill or, if required, while running.
● Further checks may be required if so specified in operating instructions of components
(Page 149) or in accordance with the plant-specific conditions.
● If you find any deviations during the inspection, you must rectify them immediately. They
may otherwise damage the motor.
9.3.4
General inspection
● Check that the installation conditions are observed. Perform the following checks after
approx. 16 000 operating hours or at the latest after two years:
Checking
When the
motor is
running
At stand‐
still
The electrical parameters are maintained
X
The permissible bearing temperatures are not exceeded
X
The smooth running characteristics and machine running noise have not
deteriorated
X
The foundation has no cracks or indentations. (*)
X
X
The machine is aligned within the permissible tolerance ranges.
X
All the fixing bolts/screws for the mechanical and electrical connections
have been securely tightened
X
All the potential connections, grounding connections and shield supports
are correctly seated and properly bonded
X
The winding insulation resistances are sufficiently high (Page 40)
X
Any bearing insulation is fitted as shown on the plates and labels
X
The CABLES and insulating parts and components are in good condition
and there is no evidence of discoloring
X
Condensation can freely flow away.
X
(*) This check can be made at standstill or when running.
● If you detect any deviations during the inspection, you must rectify them immediately. They
may otherwise cause damage to the machine.
Maintenance
9.3 Inspection and maintenance
SIMOTICS HV C 1NB1402-2AA84-4CA0-Z
Operating Instructions 06/2018
89
Содержание 1NB1402-2AA84-4CA0-Z
Страница 2: ...26 06 2018 15 34 V3 00 ...
Страница 10: ...Table of contents SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 10 Operating Instructions 06 2018 ...
Страница 22: ...Description SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 22 Operating Instructions 06 2018 ...
Страница 84: ...Operation 8 9 Faults SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 84 Operating Instructions 06 2018 ...
Страница 110: ...Disposal 11 4 Disposal of components SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 110 Operating Instructions 06 2018 ...
Страница 112: ...Service and Support SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 112 Operating Instructions 06 2018 ...
Страница 117: ...117 ...
Страница 118: ...118 ...
Страница 119: ...119 ...
Страница 120: ...120 ...
Страница 121: ...121 ...
Страница 122: ...122 ...
Страница 123: ...123 ...
Страница 124: ...124 ...
Страница 125: ...125 ...
Страница 126: ...126 ...
Страница 127: ...127 ...
Страница 128: ...128 ...
Страница 129: ...129 ...
Страница 130: ...130 ...
Страница 131: ...C 2 Declaration of conformity SIMOTICS HV C 1NB1402 2AA84 4CA0 Z Operating Instructions 06 2018 131 ...
Страница 132: ...Quality documents C 2 Declaration of conformity SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 132 Operating Instructions 06 2018 ...
Страница 133: ...133 ...
Страница 148: ...148 ...
Страница 150: ...Additional documents SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 150 Operating Instructions 06 2018 ...
Страница 154: ...Index SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 154 Operating Instructions 06 2018 ...
Страница 155: ...AF Einbauerklärung Loher LDX U157 AJ EC Declaration of Conformity U161 ...