2
SE 30/125S2 - SE 40/125S2
5408-2 - 2018
Innhold
N
Installasjons instruksjoner
Tekniske spesifikasjoner
.............................................................3
Planlegning og viktige forbehold.................................................4
Tunnel installasjon
...................................................................5
Thruster installasjon
Gearhus og motorbraket...........................................................13
Propeller ...................................................................................14
Elektromotor .............................................................................15
Elektrisk installasjon
.................................................................16
Kontrollpanel og kontrollkabler .................................................17
Koblingsskjema elektrisk
..........................................................18
Koblingsskjema
........................................................................19
Sjekkpunktliste for kontroll av installasjon
................................20
Brukermanual
Viktige forbehold .......................................................................21
Hvordan operere Sidepower thrustere .....................................22
Vedlikehold og servise ..............................................................23
Problemer og løsninger ............................................................24
Garantierklæring
....................................................................26
Reservedelsliste
....................................................................27
Installation instructions
Technical specifications
............................................................. 3
Planning & important precautions.............................................. 4
Tunnel installation
................................................................... 5
Thruster installation
Gearhouse and motorbracket .................................................. 13
Propeller .................................................................................. 14
Electromotor ............................................................................ 15
Electrical installation ............................................................... 16
Control panel and control-leads............................................... 17
Visual wiring diagram .............................................................. 18
Technical wiring diagram ........................................................ 19
Checklist for control of the installation ..................................... 20
User's manual
Important user precautions ...................................................... 21
How to use Sidepower thrusters.............................................. 22
Maintenance & service ............................................................ 23
Troubleshooting ....................................................................... 24
Warranty statement
.............................................................. 26
Spareparts list & drawing
.................................................... 27
Contents
EN
SAMSVARSERKLÆRING
Sleipner Motor AS
P.O. Box 519, Arne Svendsensgt. 6-8
N-1612 Fredrikstad, Norway
Erklærer at dette produktet med tilhørende
standard kontrollsystemer er i samsvar med
helse, og sikkerhetskravene i henhold til:
DIRECTIVE 2013/53/EU
DIRECTIVE 2014/30/EU
DIRECTIVE 2014/35/EU
DECLARATION OF CONFORMITY
Sleipner Motor AS
P.O. Box 519, Arne Svendsensgt. 6-8
N-1612 Fredrikstad, Norway
Declare that this product with accompany-
ing standard control systems complies with
the essential health and safety requirements
according to:
DIRECTIVE 2013/53/EU
DIRECTIVE 2014/30/EU
DIRECTIVE 2014/35/EU
FREDRIKSTAD, 20th of January 2018
Arne K Skauen
Managing Director, Sleipner Motor AS
Содержание SE25/110 S
Страница 29: ...29 SE 30 125S2 SE 40 125S2 5408 2 2018 ...
Страница 30: ...30 SE 30 125S2 SE 40 125S2 5408 2 2018 ...
Страница 31: ...31 SE 30 125S2 SE 40 125S2 5408 2 2018 ...