32
8011703/XF49/2019-09| SICK
O P E R A T I N G I N S T R U C T I O N S | VICOTEC320
Subject to change without notice
6
COMMISSIONING
6
Commissioning
6.1
Necessary technical knowledge for commissioning
The commissioning must only be performed by authorized technicians and is described in
the Service Manual.
6.2
Commissioning checklist
First enter the customer data.
6.2.1
Device data
Enter the device data here.
– Serial number: See type plate or SOPAS.
– Specify kind and type of process optics.
6.2.2
Tunnel data
Enter location and measuring point here.
SOPAS supports the value of the active measuring path.
Wait two hours after commissioning until the system has heated up. It has then reached
a thermal balance and delivers measured values within the tolerance band.
The up-to-date Operating Instructions must be available.
Please request the up-to-date commissioning checklist from SICK Service.