PROJECT PLANNING
4
Fig. 7: Fitting sensors with sound insulation
4.2
Electrical installation project planning
●
Sender/receiver unit (2) must always be fitted on the left (
), so that visor (4) is accessible.
●
Position connection unit (1) so that it can be connected to the sender/receiver unit with
a 1 m long cable.
●
It must be possible to separate every device singly from the power supply system, e.g.
using a switch or circuit breaker.
1
Sound insulation
Observe the relevant safety regulations during all installation work. Take suitable
protective measures against all possible local risks or those arising in connection with
the system (