Step
Procedure
Reference
6
When using the GPP measuring probe
:
Connect the power supply.
Wait for at least 30 minutes warming up
time before pushing the measuring probe
into the duct.
When using the GMP measuring probe:
Ensure the purge air supply is in opera‐
tion.
See the purge air supply Operating instruc‐
tions
7
Connect signal lines and power supply.
see "Connection overview for standard ver‐
sion", page 30
8
Calibrate the measuring device.
.
9
Install the measuring device on the duct.
see "Fitting the measuring device on the
duct", page 46
.
10
Create connections to customer data sys‐
tem. Configure according to customer
specifications.
11
Fit the weather protection hood (optional).
see "Installing the weatherproof cover",
page 47
7.5
Removing the transport safety devices of the measuring probe
7.5.1
Removing the transport safety device of the GMP measuring probe
Figure 15: Transport safety device of the GMP measuring probe
1
2 × protective caps to cover the optics
2
Protective stickers
3
Lever of locking device
3
Set the locking device to the “close” position
Steps
1.
Remove the protective stickers.
2.
Remove the protective caps.
3.
Store the transport safety device.
7
COMMISSIONING
36
O P E R A T I N G I N S T R U C T I O N S | GM901-02
8008932/16YT/V4-0/2022-02 | SICK