11.3
Removing the device
Material required
Part No.
Required for
Flange cover
--
Covering the flange.
Personal protective equipment
--
Protection when working on the stack or hot or
aggressive sample gases.
Removing the measuring system
1
Disconnect all connections between connection unit and SR-unit.
2
Remove the SR-unit,
see "Swiveling out and removing the SR-unit", page 75
CAUTION
■
Observe the information concerning removal of the SR-unit,
out and removing the SR-unit", page 75
.
3
Unscrew the purge air fixture or flange fixture from the flange, pull out the probe
and lay it down.
4
Switch the purge air supply off and disconnect the purge air hose on the device
flange.
5
Close the flanges on the gas duct with a lid.
Information on storage,
.
11.4
Environmentally compatible disposal
The device should be disposed as industrial waste.
NOTICE
b
Observe relevant local conditions for disposal of industrial waste.
WARNING
Disposal of subassemblies containing residual substances which are harmful to the
environment
The following subassemblies could contain substances that have to be disposed of sep‐
arately:
•
Electronics: Capacitors, rechargeable batteries, batteries.
•
Display: Liquid of LC display.
DECOMMISSIONING
11
8015558/YYJ8/V1.7/2016-07 | SICK
O P E R A T I N G I N S T R U C T I O N S | GM32-Ex
99
Subject to change without notice