
26
8024019/AE00/V1-0/2019-02| SICK
A D D E N D U M T O O P E R A T I N G I N S T R U C T I O N S | FWE200DH
Subject to change without notice
6
REPAIR WORK
6.2
Replacing the WBP ball valve
Replace the WBP ball valve when it is leaking or otherwise defective.
▸
WBP ball valve Part No.: 2106071
Fig. 24: WBP ball valve
Worksteps to replace the WBP ball valve:
1
Loosen both screw fittings 1 (2×) on the WBP ball valve. Remove hose connections.
2
Loosen the solenoid valve plugs on the WBP control block (
).
3
Disconnect the plug in the control cabinet. Disconnect the individual lines.
4
Loosen the two screws of base plate 2 (2×). Remove the WBP ball valve.
5
Screw the new WBP ball valve with base plate to the two fixing points.
6
Connect the solenoid valves. Pay attention to the color coding.
7
Lead the connecting line into the control cabinet. Connect the plug to the connecting ter-
minal according to the wiring diagram (see FWDE200DH Operating Instructions).
8
Check the function of the WBP ball valve by checking the spray pattern (
Hose fitting
Base plate mounting