Assembly and installation
FLOWSIC200 · Operating Instructions · 8013271/1CJ9/V2-0/2022-01 · © SICK Engineering GmbH
43
3.3.2
Information on wiring
Fig. 26
Wiring
Test
MCU
Tunnel
FLSE 200 “Slave”
FLSE200 “Master”
Junction box
FLSE200 connection cable (SICK scope of delivery)
Connection cable between MCU and junction boxes (on-site wiring)
Flow direction
Содержание FLOWSIC200
Страница 1: ...O PERATING INSTRU CTIO NS FLOWSIC200 Flow Velocity Monitor Installation Operation Maintenance...
Страница 30: ...30 FLOWSIC200 Operating Instructions 8013271 1CJ9 V2 0 2022 01 SICK Engineering GmbH Product description...
Страница 100: ...100 FLOWSIC200 Operating Instructions 8013271 1CJ9 V2 0 2022 01 SICK Engineering GmbH Commissioning and parameterization...
Страница 104: ...104 FLOWSIC200 Operating Instructions 8013271 1CJ9 V2 0 2022 01 SICK Engineering GmbH Maintenance...
Страница 121: ...Specification FLOWSIC200 Operating Instructions 8013271 1CJ9 V2 0 2022 01 SICK Engineering GmbH 121...