84
FLOWSIC100 Flare · Operating Instructions · 8013344/11L2/V 2-5/2018-10 · © SICK Engineering GmbH
Assembly and Installation
Su
bj
ect
to
ch
an
ge
with
ou
t n
otic
e
3.3
Assembly
Carry out all assembly work on-site. This includes:
Fitting the nozzle
Installing ball valves on retractable versions
Installing the meter body (option)
Installing the control unit.
Installing the sun roof.
WARNING:
Observe the relevant safety regulations as well as the safety notices in
Section 1 during all assembly work.
Carry out assembly work on equipment with hazard potential (hot or
aggressive gases, higher internal pipeline pressure) only when the
equipment is at a standstill.
Fitting when the equipment is running is only possible using the "hot
tapping method". Such work may only be carried out by a specialized
contractor authorized by the plant operator (
Take suitable protection measures against possible local hazards or
hazards arising from the plant.
WARNING:
Mechanical burden
The static load moment of all parts to be installed at the pipe can be up to
approx. 600 Nm (retractable device types). Strong pipe vibrations can cause
damages and can lead to dangerous situations.
Use a mechanical support for the nozzles welded to the pipeline, e.g.
"gusset plates".