
55
8024493/AE00/V1-0/2020-09| SICK
O P E R A T I N G I N S T R U C T I O N S | DUSTHUNTER SP100 Ex-2K
Subject to change without notice
ELECTRICAL INSTALLATION
7
7.5.2
Work to be done
▸
Connect the connection line:
see “Connection overview”, page 51
.
▸
Connect lines for status signals (operation/malfunction, maintenance, function check,
maintenance request, limit value), analog output, analog and digital inputs according to
requirements (
see “Connection overview”, page 51
and
▸
Connect power line to terminals L1, N, PE of the control unit (
▸
Close off unused line ducts with dummy plugs.
7.5.3
MCUDHEx-3K processor board connections
Fig. 23: MCUDH Ex-3K processor board connections
NOTE:
Alternative connection options to the connecting line with Ex-Plug-Connector on
request.
NOTE:
If more connecting lines are to be inserted than initially planned, a set with line ducts is
available for the MCUDH Ex-3K control unit (
see “Spare parts, MCUDH Ex-3K control
).
NOTICE:
Faulty wiring can damage the measuring system
▸
Be sure to check the potential equalization of the devices and the wiring before
switching the supply voltage on.
▸
Only modify wiring when disconnected from the power supply and potential-free.
á
à
Supply voltage 24 V DC
Service interface RS485 for
SOPAS communication
Connection for option I/O
module - use not permitted for
MCUDHEx-3K
Connection for Display module
Connection for LEDs - use not
permitted for MCUDHEx-3K
Connection for optional Inter-
face module
USB plug connector
Connections for sender/
receiver units
Connections for relays 1 to 5
Connections for digital inputs
1 to 4
à
Connection for analog output
á
Connections for analog inputs
1 and 2