44
8024493/AE00/V1-0/2020-09| SICK
O P E R A T I N G I N S T R U C T I O N S | DUSTHUNTER SP100 Ex-2K
Subject to change without notice
6
ASSEMBLY
6.4
Installation sequence
Installation is carried out according to the sequence in this Section, the sender/receiver
unit is not installed until commissioning.
All dimensions specified in this Section are shown in mm.
NOTICE:
Device damage due to premature installation of the measuring device on the
gas duct
Unsuitable ambient conditions or the atmosphere in the measuring duct can damage
the measuring system and make intended use impossible.
▸
The sender/receiver unit is first positioned in the duct during commissioning (