Before installing a Nano manual shade,
the spring tension must be set
. The amount of pre-tensions
required for each shade varies and can be found on the attached shade list.
1. Insert the pre-tension tool into the spring control, and rotate counter-clockwise until the correct
number of pre-tension rotations are set.
NOTE: For reverse roll shades, the
tension direction will be opposite.
Pre - Tension - Nano Roll - Manual
Pg 5
PRE-TENSION –
Nano Roll – Manual Operation
NOTE: Start with arrows and small
rib facing up.
Содержание Nano Roll
Страница 2: ...INSTALLERS Please leave this manual with the owner Nano Roll Manual Operation Instructions...
Страница 6: ...SHADE ORIENTATION Reverse Roll Spring side Idler side Shade Orientation Nano Roll Reverse Roll Pg 4...
Страница 15: ...NOTES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Notes Pg 13...
Страница 16: ...NOTES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Notes Pg 14...