Shire Abri Apex Скачать руководство пользователя страница 4

1

Check and ensure that no raised grain or
splinters are evident on timber components.
Sand down any raised grain or splinters
using fine grade sandpaper.

2

Check that all screw, nail and pin heads are
properly tapped home and are not proud of
the timber surface.

3

Check and ensure that no screws, nails or
pins protrude through any panel.

4

Check and ensure that all parts are properly
secured against reasonable force.

5

Do not apply decorative wood
finish/treatments to wet or damp timber.
Please observe the instructions of the wood
finish/treatment manufacturer.

Assembly Completion Checklist

3 Place the smallest piece of felt at

the peak (ridge) of the building. This
piece will overlap both of the other
pieces of felt.  Nail into position
along both edges of this piece and
at both ends.

2 Starting at the lower edge (the

eaves) place one 1 mtr wide piece
from the front to the back of the
building. An overhang of
approximately 45mm should be
allowed on each of the 3 sides
although the felt will overhang at the
back by more than this. Secure the
felt using felt nails spaced at
100mm intervals. Repeat, but do not
nail along the centre of the building
until the piece of felt covering the
ridge is in place.

1 Screw all side panels to the floor on

the inside of the building using 1x
60mm screw per separate panel
and 1x 80mm screws into each of
the two panels ‘B1’ either side of the
doors.

I

Secure Walls to Floor

K

Facias & Diamond Assembly

1 Fit four facia boards ‘K’ to either

sides of the roof using 3x 40mm
nails per piece.

J

Fit Coverstrips

1 Cover strips ‘I’ are nailed over the

joins between all side panels and at
each corner. Secure in place using
4x 40mm nails per strip.

2 Carefully trim off excess felt with

cutting knife against the edge of the
facia board.

3 Nail diamonds ‘K1’ on top of and in

the centre of the facia board using
2x 40mm nails per diamond.

Placing Glazing Material in Window

1 Place glazing material ‘L’ into the

aperture of each window.  

2 Hold into position with four pieces of

beading ‘L1’. The beading may
need to be swapped around to get
the best fit. When satisfied secure
into position using 2x 15mm panel
pins per piece of beading. Repeat
for all window apertures.

H

Felt Roof

1 Two rolls of felt ‘J’ have been

supplied.  Lay out the largest roll
and cut in half length ways..

2 Place both panels on the walls at

the back, flush and even with the
back wall and flush at the ridge.

3 Secure to the back gable using 3x

40 mm nails into each gable.
Repeat.

4 Nail from outside into roof bearers

using 3x 40 mm nails for each roof
panel/bearer.

5 Nail through roof boarding into side

wall using 3x 40 mm nails per roof
panel.

6 Repeat for all roof panels. 
7 At the front of the building under the

overhang fit two short bearers 'H3'
Ensure the bearers are flush with
the inside edges of the roof
sections and flush with the outside
edge of the front of the roof.

8 Fix in position from the outside

using 2x 60 mm screws for each
bearer.  Secure together from the
inside using 2x 60 mm nails

9 Secure the front roof panels to the

front wall using 3x  40 mm nails in
each side.

Отзывы: