background image

09

 

Before you start... 

Things to check before you start:

 

 

Check all parts as listed in the parts lists 

 

Read the instructions fully before starting work 

 

Follow all the health and safety guidelines. 

 

Ensure your base is ready – See page 4 

You will need:

 

 



Hammer 

 

 



Spirit level 

 



Ladder 

 

 

 



1mm 5mm ,8mm,drill bit 

 

 



Drill

 

 

 

 

 



Tape measure & Ruler

 

 

  

 



Sand paper                         

 

 



Gloves 

 

 

 



Saw

 

 

 

 



Pencil 

 

 

 



Goggles

  

 

 

 

 



A helper for some

 

 tasks

 

 

 



 Screwdriver   

 

 

 



 Sharp knife

 

 

 



Masking tape      

 

 

When you see the drill icon 

Only ever drill through the first 

piece of framework which will be a 

pilot hole for the screw to attach the 

second piece of framework 

The required drill bit size is 

shown with the icon. 

6mm  

In more detail

….. 

GB 

IE 

Содержание 10x6 Sun Pent

Страница 1: ...10x6 Sun Pent Version 3 23 01 2020 Julian Shepherd These instructions are for your safety Please read through them thoroughly before use PLEASE KEEP THIS LEAFLET FOR FUTURE REFERENCE...

Страница 2: ...j zyku prosimy o wys anie maila lub pisa na adres podany poni ej RUS TR Ba ka bir dilde talimatlar veya bir kopyas n bir kopyas i in bir e posta g nderebilir veya a a daki adrese yaz n z EN For a copy...

Страница 3: ...bly Only use child and animal safe wood preservative Do not use creosote Allow the wood preservative to fully dry before use Regularly check the building for wear and tear Getting Started GB IE EVERY...

Страница 4: ...y prior to or after assembly The building must have been re treated and re sealed annually NOTE Wood is a natural product and therefore the following are excluded from the warranty Colour change Warpi...

Страница 5: ...6 golden rules of maintenance 1 Timber widely recycled 2 Metal fixings widely recycled 3 Glass widely recycled 4 Roofing felt not currently recycled packaging Building 1 Ensure your base is level and...

Страница 6: ...Stacked Parts List Description part No Qty 06...

Страница 7: ...Fascia Bag Parts List Description part No Qty 07...

Страница 8: ...0023 x 140 8mmFelt Nail A0025 x 42 40mmRound head nail A0035 x81 60mmPosi drive screw Nail bag contents Description part No QTY 13mm A0031 x04 Posi drive screw Black 25mm A0024 x128 16mm Panel Pin A00...

Страница 9: ...4 You will need Hammer Spirit level Ladder 1mm 5mm 8mm drill bit Drill Tape measure Ruler Sand paper Gloves Saw Pencil Goggles A helper for some tasks Screwdriver Sharp knife Masking tape When you see...

Страница 10: ...10 In more detail GB IE...

Страница 11: ...11 In more detail GB IE...

Страница 12: ...ve the transport blocks from the bottom of the panels by gently tapping one end with a hammer 12 REMOVE TRANSPORT BLOCKS 01 Floor panel A1512 x02 GB IE Drill ONE of the A1512 floor panels only at the...

Страница 13: ...in the LH End panel A1513 only The LH Back panel A1766 is positioned first on top oft he Floor A1512 and goes into the corner Notch to the middle of the back The cladding overlaps the floor Push the...

Страница 14: ...n the LH Back panel A1766 only The RH Back panel A1766 is pushed up to the other back panel and fixed together Both the back and front panels fill the entire floor length 04 RH Back Panel A1766 x01 5...

Страница 15: ...e LH Front Panel A1765 in the side where the notch is only Push the RH End panel A516 up to the back and fix as before The RH Front Panel A1765 goes in front of the side and screws from that panel 05...

Страница 16: ...Front panel A1765 fits in front of the side The front panel is fixed using the holes drilled in the last step 06 GB IE Unlock the door and fit the Black Knob set A2888 07 60mm Screws A0035 x06 25mm Bl...

Страница 17: ...block is fitted 44mm below the notch and the back one 39mm Drill a hole half way in to the blocks 8mm then through with a 5mm drill And fix with 80mm screws Place the truss bars on the top and drill a...

Страница 18: ...end of the support frame Position the Roof A1517 so the support frame sits on top of the ends frame and the slot goes over the cladding Centralise the roof and fix through the holes just drilled Mark...

Страница 19: ...A0035 x13 Roof Panel A1517 x01 Drill and fix the second roof panel as with the previous step Inside the building where the roofs meet drill through one sides framework and fix together with 3 screws...

Страница 20: ...to hold the felt in position nail the sides to the wall with 4 nails each and at the bottom nail at approximately 100mm centres The next piece overlaps the lower piece Measure the roof and work out a...

Страница 21: ...GB IE Fix the panels to the floor with 2x60mm screws per panel using the holes previously drilled NOTE make sure the screws go into the floor bearers 13 40mm Nails A0025 x24 60mmScrew A0035 x12 56mm F...

Страница 22: ...is flush with the felt at the corner Drill and fix the Fascia s with 4 nails each side Drilling prevents splitting The two front fascia A2915 fits across the end fascia s Drill and fix the Fascia wit...

Страница 23: ...rrow side to the floor The outer pair are pushed up to the front and end walls drill 2 holes at the bottom into floor bearers and two at the top inline with the end framework The middle legs are fitte...

Страница 24: ...mm 24 GB IE Position the Bench top A1772 2 and screw into position with the holes drilled in the last step 17 GB IE Push the Safety vents A0476 into the holes in the back panel 18 Safety vent A0476 x0...

Отзывы: