27(40)
5.1.3 Installation Methods of SAL-330/360 Optional Proportional Valve SPV-U
Picture 5-3
:
Installation method of optional SPV-U
Machine Installation
Mount SPV-U at material inlet of SAL-330/360, connect two material inlets of
SPV-U to two feeding pipes respectively, insert another end of the feeding pipes
in the hoppers.
Circuit Connection
The machine requires compressed air to finish filter cleaning function, so please
connect to the compressed air. The pressure of compressed air: 4~6kgf/cm
2
Содержание SAL-330
Страница 1: ...SAL 330 360 Self contained Hopper Loader Date Jan 2016 Version Ver B ...
Страница 2: ......
Страница 6: ...6 40 ...
Страница 21: ...21 40 4 Electrical Circuit Diagram 4 1 Electrical Diagram Picture 4 1 Electrical diagram ...
Страница 31: ...31 40 6 2 Function Setup 6 2 1 Setup ...
Страница 33: ...33 40 ...
Страница 34: ...34 40 ...