16 Special Functions
16.1 Time Scheduler
213
GC-2014
16.1.4
Editing a time schedule
Select “2. EDIT” from the time scheduler menu to display the schedule number or the day of
the week setup screen shown in Fig. 16.1.3. Before editing a schedule, select the schedule
number or the day of the week, and press [Edit] (PF menu). Then, the schedule edit screen
shown in Fig. 16.1.4 appears.
You do not have to set schedules in the order of execution time. After editing time schedules,
they are automatically sorted. More than one schedule can be set to the same time. These
schedules will be executed at the same time.
16.1.5
PF menu
Fig. 16.1.3
Schedule number selection screen
Fig. 16.1.4
Schedule edit screen
PF menu
Description
Reference
section
New
Creates a new time schedule.
16.1.6
Del Line
Deletes a schedule line at the current cursor position.
Содержание GC-2014
Страница 4: ...This page is intentionally left blank ...
Страница 12: ...Contents viii GC 2014 This page is intentionally left blank ...
Страница 28: ...1 Installation 1 3 Gas Supply Plumbing 16 GC 2014 This page is intentionally left blank ...
Страница 42: ...2 Before Use 2 6 Connecting the Relay Terminals 30 GC 2014 This page is intentionally left blank ...
Страница 78: ...5 Analysis 5 2 Notes for Analysis 66 GC 2014 This page is intentionally left blank ...
Страница 90: ...6 Basic Key Operation 6 4 Getting Help 78 GC 2014 This page is intentionally left blank ...
Страница 130: ...11 Creating an Oven Temperature Program 11 2 Temperature Programs 118 GC 2014 This page is intentionally left blank ...
Страница 164: ...12 Injection Port 12 5 Setting the Flow Rate Parameters 152 GC 2014 This page is intentionally left blank ...
Страница 282: ...16 Special Functions 16 10 ROM Version No 270 GC 2014 This page is intentionally left blank ...
Страница 318: ...306 GC 2014 This page is intentionally left blank ...