Operating manual: Submersible motor pumps Tegernsee & Tegernsee DIN 14425
– TP 4/1
SHG
S
PECHTENHAUSER
H
OCHWASSER
-
UND
G
EWÄSSERSCHUTZ
G
MB
H
Gewerbestraße 3, D-86875 Waal, Germany
www.spechtenhauser.de
Tel.:
+49 8246.9695-20
Fax:
+49 8246.9695-24
0720BATSE008
21
5. Insert the upper pump base with counter plate in
the opening of the spiral housing until it stops.
Screw the upper pump base with the spiral hous-
ing using the three cylindrical screws with hexa-
gon socket (M8). To fasten the screws, medium-
strength screw locking (Loctite) is to be used.
Please refer to Table 6.4.1 for the correct screw
tightening torque.
6. Make sure that the sealing cord in the lower pump
base is positioned correctly in the recess.
7. Place the lower pump base on the already
mounted upper pump base and screw them to-
gether using the four cylindrical screws with hexa-
gon socket (M6). To fasten the screws, medium-
strength screw locking (Loctite) is to be used.
Please refer to Table 6.4.1 Screw tightening
torque for the correct screw tightening torque.
8. Make sure that the pump base including all parts
is fixed correctly.