background image

Page 1

Storage Hall

132613R 13’x26’x13’

W4.0xL8.0xH4.0m

Assembly Instructions

RECOMMENDED TOOLS

Please read instructions COMPLETELY before assembly. This shelter MUST be securely anchored.

THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE.

Before you start: 3+ individual recommended for assembly, approximate time 4.5 hr.

Содержание 132613R

Страница 1: ...ctions RECOMMENDED TOOLS Please read instructions COMPLETELY before assembly This shelter MUST be securely anchored THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE Before yo...

Страница 2: ...bolt together overhead poles during assembly Beware of pole ends PROPER ANCHORING AND INSTALLATION OF FRAME PROPER ANCHORING OF THE FRAME IS THE RESPONSIBILITY OF THE CONSUMER We are not responsible...

Страница 3: ...Purlins 20 5 Tension Pipe 2 6 Bracing Pipe 4 7 The Front Wall Rail 1 8 Hangar Rod 1 9 Pulling Rod 1 10 Upright for Back Wall 1 11 Upright for Back Wall 1 12 Middle Rails for Back Wall 2 13 Tension Pip...

Страница 4: ...ack wall 64 6 21 Bolt M10x30mm for Connection Plate 4 2 22 Bolt M10x60mm for Connection Plate 4 2 23 Bolt M8x50mm for Bracing Pipe 8 2 24 Pipe Clip 60 8 25 Tension Strap 32 1000mm 10 2 26 Plastic Plug...

Страница 5: ...Page 5 INSTALLATION PROCESS Base Plate Installation Please refer to the diagram below to mark the position of base plates...

Страница 6: ...Page 6 Frame Installation Step 1 Arch No 1 Front Wall...

Страница 7: ...Page 7 Step 2 Arch No 2 No 3 and No 4...

Страница 8: ...Page 8 Step 3 Arch No 5 Back Wall...

Страница 9: ...Page 9 Step 4 Purlins and Sidewall Bracing Tubes Step 5 Squaring Up The Frame and Install Stake Pegs...

Страница 10: ...Page 10 Cover Installation Front Cover and Front Door Back Cover...

Страница 11: ...Page 11 Roof Cover Now your assembly is completed...

Отзывы: