16 |
P a g e
INSTALLATION
P
OWER
F
EED
W
IRING
The oven comes provided with an integral 6 inch (15 cm) wire braid of two 14-gauge high-
temperature (300°C) hot wires and a 14-gauge earth ground.
The wires for power source connection should be Green/Yellow – Earth; Black – Hot; Red – Hot.
The oven must be earth grounded using the protective conductor terminal
(green with yellow
stripe wire. Do not remove the protective conductor (earth connection). Removing the protective
conductor will negate the oven’s protections against potentially dangerous electric shocks and
create a possible fire hazard.
L
IFTING AND
H
ANDLING
The oven is heavy. Use appropriate lifting devices that are sufficiently rated for these loads. Follow
these guidelines when lifting the oven:
•
Lift the oven only from its bottom surface.
•
Doors, handles, and knobs are not adequate for lifting or stabilization.
•
Restrain the oven completely while lifting or transporting so it cannot tip.
•
Remove all moving parts, such as shelves and trays, and secure the door in the closed
position during transfers to prevent shifting and damage.
L
EVELING
Install the 4 leveling feet with the 4 corner holes on the bottom of the oven.
The oven must be level and stable for safe operation.
Note:
To prevent damage when moving the unit, turn all four leveling feet so that the leg of each
foot sits inside the unit.
Содержание SMO5HP-2
Страница 1: ...Installation Operation Manual SMO5HP 2 HIGH PERFORMANCE OVEN 220 240 Voltage...
Страница 8: ...8 P a g e INTRODUCTION...
Страница 12: ...12 P a g e RECEIVING YOUR UNIT...
Страница 18: ...18 P a g e INSTALLATION...
Страница 20: ...20 P a g e GRAPHIC SYMBOLS...
Страница 22: ...22 P a g e CONTROL PANEL OVERVIEW...
Страница 38: ...38 P a g e USER MAINTENANCE...