Installation Instructions
Ledge Shelving
243-WT | 243-BK
Tools Required (not included):
- Power Drill
- 3/32" Drill Bit or 3/16" Drill Bit
- Screwdriver
- Tape Measure
- Level
Installation Materials (included):
- (3) Ledge Shelves
- Mounting Hardware
Load Rating:
- 40 lbs each shelf when mounted
onto studs
Installation
:
STEP 1:
Select installation areas and mark the keyhole locations on wall the correct
distance apart. Use a level to make sure the ledges will be straight, as shown in
Figure 1
.
STEP 2:
Pre-drill pilot holes with a 3/32" drill bit in the marked locations. If a stud is
present, insert and fasten the screw leaving a 5/32" gap. If no stud is present, use a 3/16"
drill bit to enlarge the 3/32" hole. Insert the anchor and fasten the screw into the anchor
leaving a 5/32" gap, as shown in
Figure 2
.
STEP 3:
Attach each ledge by placing the keyholes over the screws and applying a light
downward force, as shown in
Figure 3
.
NOTE:
Shelving can be installed with the sides pointing up or down.
Figure 2
5/32"
5/32"
Dr
ywall
Dr
ywall
Stud
Figure 1
Level
Back of Shelf
x
x
Figure 3
2700 Oak Industrial Dr. NE
Grand Rapids, MI 49505
800-253-1561
www.kv.com
©2015 Knape & Vogt. KV and the KV logo are trademarks of Knape & Vogt. 310460/0715