
27
|
P a g e
OPERATION
L
OADING
S
AMPLES
The manufacturer strongly recommends waiting at least 8 hours after putting the incubator in
operation before loading samples in the chamber. This safeguards samples against temperature
instability. The samples should by placed at least 1 inch (25 mm) away from the chamber walls.
Proper spacing allows for maximum air circulation and a higher degree of temperature uniformity.
A
CCESSORY
C
OMPATIBILITY AND
P
OWER
O
UTLET
Outlets
The SRI3 is provided with 2 power outlets inside the chamber. Do not attach powered equipment
drawing more than 1 amp from both outlets.
The SRI3-2 is provided with 1 power outlet inside the chamber. Do not attach powered equipment
drawing more than 1 amp from the outlet.
SRI3
SRI3-2
110 – 120 Volt
220 – 240 Volt
Accessories
Verify any powered accessory equipment used inside the chamber can safely and effectively
operate within your selected temperature range. Powered equipment, such as stirrers or shakers,
can generate heat sufficient to disrupt the thermal uniformity and stability of the chamber.
Содержание SRI3
Страница 1: ...BOD INCUBATOR 110 120 Voltage 220 240 Voltage Installation Operation Manual SRI3 SRI3 2...
Страница 8: ...8 P a g e INTRODUCTION...
Страница 12: ...12 P a g e RECEIVING YOUR UNIT...
Страница 20: ...20 P a g e GRAPHIC SYMBOLS...
Страница 22: ...22 P a g e CONTROL PANEL OVERVIEW...
Страница 38: ...38 P a g e USER MAINTENANCE...