
21 |
P a g e
INSTALLATION
S
HELVING
I
NSTALLATION
Install the shelving in the incubation chamber.
Install the shelf standard rails.
•
Align the keyhole slot of the standard with the
mounting peg on the side of the chamber wall.
•
Mount the shelf standard.
Install the shelf slides.
•
Insert the shelf slide into the shelf standard
using a rocking motion.
•
The shelf slide will sit level when correctly
installed.
Install the shelves.
•
Slide into position.
Shelving Installation
Содержание SCO6WE-2
Страница 1: ...ECONOMY WATER JACKETED CO2 INCUBATOR 220 240 Volts Installation Operation Manual SCO6WE 2...
Страница 6: ...6 P a g e TABLE OF CONTENTS...
Страница 14: ...14 P a g e RECEIVING...
Страница 24: ...24 P a g e INSTALLATION...
Страница 59: ...59 P a g e PARTS...