![Shel lab SCO10A Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/shel-lab/sco10a/sco10a_installation-and-operation-manual_1255275017.webp)
17 |
P a g e
INSTALLATION
P
OWER
S
OURCE
R
EQUIREMENTS
When selecting a location for the unit, verify each of the following requirements is satisfied.
Power Source
: The power source must match the voltage and amperage requirements listed on the
unit data plate. These units are intended for
110 – 120 volt
,
50/60 Hz
applications at the following
amperages:
Model
Amperage
Model
Amperage
SCO5A
6.0 Amps
SCO10A
6.0 Amps
*The SCO10A comes with two power cords. It requires
6.0 amps
for each cord.
•
The wall power source must be protective earth grounded
.
•
The unit may be damaged if the supplied voltage varies by more than 10% from the data
plate rating.
•
Use a separate circuit to prevent loss of the unit due to overloading or circuit failure.
•
The recommended wall circuit breakers for these units are 15 amps.
•
The wall power source must conform to all national and local electrical codes.
Power Cord:
The unit must be positioned so that all end-users can quickly unplug the cord in the
event of an emergency.
•
Each unit is provided with a
125-volt, 15 amp, 9ft 5 in (2.86m) NEMA 5-15P
power cord.
Always use this cord or an identical replacement.
Fuses:
Each unit ships with a fuse installed in the power cord inlet.
•
The fuse must be installed and intact for the unit to operate.
•
Always find and fix the cause of a blown fuse prior to putting the unit back into operation.
•
Fuse type:
o
250V T10 Amp, 5x20mm
Standard
NEMA 5-15R
wall socket
Содержание SCO10A
Страница 1: ...AIR JACKETED CO2 INCUBATOR 110 120 Volts Installation Operation Manual SCO10A SCO5A...
Страница 6: ...6 P a g e TABLE OF CONTENTS...
Страница 24: ...24 P a g e INSTALLATION...
Страница 26: ...26 P a g e SYMBOLS...
Страница 59: ...59 P a g e PARTS...