LC-60/70EQ10U,SQ10U/15U/17U,TQ15U,UQ17U
4 – 14
[4] Precautions for assembly (LC-60/70EQ10U/SQ10U,15U,17U)
1. Points to be checked and precautions when servicing the unit
Mount the main PWB Ass’y on the backlight chassis and check that the EMI-prevention parts are not peeled and twisted from the access holes. (The
EMI-prevention parts, conductive nonwoven fabric gaskets, must be seen from the access holes.)
[Countermeasure]
Attach the conductive nonwoven fabric gaskets on the shielded case on the main PWB.
•
LC-60EQ10U/SQ10U,15U,17U
Back side
(1) Prepare***
LANGKD145WJFW
TERM ANG SIDE
(2) Stick ***
PSPAZC690WJZZ
CONDUCTR:8x255
Positioning
Positioning
Back side
Positioning
Positioning
(1) Prepare***
LANGKD146WJFW
TERM ANG BOTTOM
(2) Stick ***
PSPAZC691WJZZ
CONDUCTR:8x180
Содержание Aquos LC-60SQ10U
Страница 46: ...LC 60 70EQ10U SQ10U 15U 17U TQ15U UQ17U 2 36 MEMO ...
Страница 89: ...LC 60 70EQ10U SQ10U 15U 17U TQ15U UQ17U ...
Страница 100: ...LC 60 70EQ10U SQ10U 15U 17U TQ15U UQ17U 2 1 LC 60EQ10U Service Manual CHAPTER 2 OPERATION MANUAL 1 OPERATION MANUAL ...
Страница 101: ...LC 60 70EQ10U SQ10U 15U 17U TQ15U UQ17U 2 2 ...
Страница 102: ...LC 60 70EQ10U SQ10U 15U 17U TQ15U UQ17U 2 3 ...
Страница 103: ...LC 60 70EQ10U SQ10U 15U 17U TQ15U UQ17U 2 4 ...
Страница 104: ...LC 60 70EQ10U SQ10U 15U 17U TQ15U UQ17U 2 5 ...
Страница 105: ...LC 60 70EQ10U SQ10U 15U 17U TQ15U UQ17U 2 6 ...
Страница 218: ...LC 60 70EQ10U SQ10U 15U 17U TQ15U UQ17U 7 4 MEMO ...