55
5 Maintenance
5.3.3
Confirming adjustment
As part of the adjustment process, each completed test must
be stored in memory. This is done via the
Inspection OK
menu
item. As a result:
z
The test date is saved.
z
The next adjustment date is calculated based on the specified
inspection interval.
z
An inspection block (if set) is triggered.
Confirm the completed adjustment on the device as follows:
z
Using the or key, select the
Inspection OK
menu item.
z
Confirm your selection with the
key.
5.4
Servicing
The device must only be serviced and repaired by SEWERIN
Service or a qualified service technician/company authorised by
SEWERIN.
z
Send the device to SEWERIN for repairs and for annual main
-
tenance.
Note:
If there is a service agreement in place, the device can
be serviced by the mobile maintenance service.
The inspection plate on the device shows
confirmation of the last maintenance and the
next scheduled maintenance.
Содержание EX-TEC PM 4
Страница 1: ...Operating Instructions...
Страница 5: ...Operating Instructions 20 04 2016 V2 XXX 105806 en EX TEC PM 4...