![SEW-Eurodrive DFE32B PROFINET IO Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/sew-eurodrive/dfe32b-profinet-io/dfe32b-profinet-io_manual_1250328027.webp)
Manual – DFE32B Fieldbus Interface PROFINET IO
27
4
Operating display DFE32B option
Assembly and Installation Notes
Link/Activity LED
The two LEDs
Link (green)
and
Activity (yellow)
, integrated in the RJ45 plug connec-
tors (X30, X32), display the status of the Ethernet connection.
4.10.2 Gateway LED
LEDs H1 and H2 indicate the communication status in gateway operation.
61880AXX
LED/state
Meaning
Link/green
There is an Ethernet connection.
Link/off
There is no Ethernet connection.
Activity/yellow
Data is currently being exchanged via Ethernet.
X30
X32
LED "Link"
LED "Activity"
INFORMATION
• As the firmware of the DFE32B option card requires approximately 10 seconds for
initialization, the status "0" (inverter not ready) is displayed in the 7-segment dis-
play of MOVIDRIVE
®
during this time.
• The Run LED on the DFE32B option card lights up green.
58129axx
LED H1 Sys-fault (red)
Only for gateway function
Status
Status
Description
Red
System error
Gateway is not configured or one of the
drives is inactive
Off
SBus ok
Gateway is configured correctly
Flashing
Bus scan
Bus is being checked by the gateway
X24
H1
H2
INFORMATION
• LED
H2
(green) is currently reserved.
• X terminal X24 is the RS485 interface for diagnostics via PC and MOVITOOLS
®
MotionStudio.
Содержание DFE32B PROFINET IO
Страница 2: ...SEW EURODRIVE Driving the world...
Страница 131: ......