background image

9

3.2 PLUMBING (ATTACHING PRESSURE TUBING)

Warning: Always attach tubing to the SRPM header and then place 
Header onto SRPM. This will prevent overpressure from crimped or 
collapsed tubes. 

Use the following procedure for all room types: positive, negative or 
neutral:
Typically a Room Pressure Snubber (RPS) is installed in the monitored 
room. Often stiff nylon ¼” tubing is used for running pressure signals 
from the SRPM to the monitored spaces. To prevent buckling and 
collapse of this stiff tubing inside the electrical box, use the supplied soft 
silicone tubing and tubing adaptors to transition from the fi eld tubing to 
the pressure fi ttings on the SRPM.
 Attach pressure tubing as follows:
1.      Connect the 1/4 inch O. D. tubing running from the RPS (or 
other pressure connection from the 

monitored 

space) to the 4½ x 4½ 

electrical box for the SRPM. Install one of the supplied 1/4 inch male 
to male barbed tube adaptors onto the end of the tube then push the 
4” length silicone tube (supplied) onto the other end. Thread the tubes, 
with installed adaptor, through the conduit opening at the bottom of the 
electrical box.
2.      Next push the open end of the silicone tubing onto the SRPM 
pressure tube header (H1) port labeled “+”. Note: The header is an 
Electro-Pneumatic (EP) assembly. “+” indicates (Positive) pressure, and 
“-” indicates negative or reference pressure.
3.      For the most pressure stable operation, an RPS installed in the 
reference pressure area is also recommended. In this case, install the 
RPS in a hallway or reference space. Attach the tube to the SRPM in the 
same way as for the + port, except attach the tube to the “-” port on the 
pressure tube header. Tighten swivel fi ttings on the SRPM Header H1 
assembly if they become loose, 9 in lb. max. Verify that the tubes are not 
buckled, which could close off pressure signal at end of installation.

1/4” O.D. 

Tubing

Electrical Box

Silicone 

Tubing

RPS Tubing

SRPM 

Header H1     

RPS Room Pressure Snubber

Plumbing inside Electrical Box

Содержание SRPM

Страница 1: ...1 Model SRPM Room Pressure Monitor Installation and Operating Manual...

Страница 2: ...that guide the user through setup as well as setting up password protection Red and green LED s and a local audible alarm with time delay feature alert personnel to system status The SRPM has a NEMA 1...

Страница 3: ...m Relay 10 3 3 2 Remote Annunciator 10 3 3 3 Door status input 11 3 3 4 Analog Output 11 3 3 5 BACnet 12 4 0 Startup and Operation 13 4 1 Menu Tree 13 4 2 Power Up 13 4 3 Monitoring Screen 13 4 4 Main...

Страница 4: ...curacy 0 5 F S 0 25 FS optional Operating Temperature Limits 32 to 120 F 0 to 50 C Operating Humidity Limits 5 to 95 Relative humidity non condensing Altitude 2000 meters max Thermal Effects 0 03 F S...

Страница 5: ...network User Interface LCD Display 128 x 128 COG module with custom RGB LED backlight and custom 4 wire resistive touch screen RGB Backlight The SRPM indicates the status of the room being monitored...

Страница 6: ...ity 1 Room pressure snubber Assembly 2 4 Parts required and to be supplied by installer MOUNTING AND WIRING To mount and install properly the following components are required NOT INCLUDED and require...

Страница 7: ...y standard the electrical installer must comply with the following earth ground instructions Pre wire the electrical box with power 24 VAC or 120 240 and provide earth grounding to the electrical box...

Страница 8: ...wiring is 22 AWG stranded wire in a shielded cable a Gnd S and shield should be run This can be 2 twisted pairs with a separate cable shield One twisted pair is used for communications the second twis...

Страница 9: ...male to male barbed tube adaptors onto the end of the tube then push the 4 length silicone tube supplied onto the other end Thread the tubes with installed adaptor through the conduit opening at the...

Страница 10: ...mmon of the internal alarm relay Connect P2 to A1 Located on Remote Annunciator this supplies 15V exc to the Annunciator for powering the circuit during normal conditions Connect P3 of J4 to A2 of SRA...

Страница 11: ...tact closure indicates that the door is closed This is a low voltage circuit 5 VDC Run 2 wires from the door switch to connector J6 on the SRPM See Section 8 0 The door input status function is enable...

Страница 12: ...itch S1 located in the upper right hand section of the PCBA as well as through the touch screen interface see Section 4 4 and 4 9 Position Function 1 MAC address enable 2 N C Not Connected 3 Pull Up R...

Страница 13: ...the screen give you access to the functions that can be performed 4 1 MENU TREE See section 9 0 4 2 POWER UP Apply power and observe the welcome screen and subsequent transition to the pressure monit...

Страница 14: ...password output engineering units and display averaging Room Set up high and low pressure limits to monitor a positive negative or neutral room Operator password setup Alarm Setup latch alarm audible...

Страница 15: ...Change will open Password Setting Screen To change the password enter the present password numeric value followed by the new password in the New Password and Con rm New Password entry boxes then press...

Страница 16: ...ox above the keypad Note The cursor will blink for one to two seconds then stop and display the character Erase any mistakes by using the Back Space key When nished entering data press the Enter key t...

Страница 17: ...e Lower Limit is negative and the Upper Limit is positive the room will be a Neutral Room OPERATOR PASSWORD The operator can only change the room from Occupied to No Isolation and vice versa Lightly p...

Страница 18: ...e alarm resumes This assumes that the room static pressure is still outside the normal or set operating limits The Mute Time Out can be set from 0 to 9999 seconds e Set the Alarm Delay in seconds from...

Страница 19: ...rotected area of the EEPROM memory hasn t been corrupted and also test the alarm to verify the sound level and alarm setup Press Self Test button to initiate EEPROM memory checksum test sequence Press...

Страница 20: ...urate Pressure Calibrator is available apply a steady full scale pressure signal to the on the header tting and press or tap the Span button Reconnect the room pressure tube and calibration is complet...

Страница 21: ...BACnet setup by moving the dip switch position 1 to off left position If the unit will be at the end of the line the pull up resistor can be enabled by pushing position 3 to on The termination resisto...

Страница 22: ...the preset pressure limits the screen turns to yellow Room static pressure outside of the preset limits is indicated by a Red screen after the alarm s time delay expires CHANGING ROOM MODES The SRPM c...

Страница 23: ...med condition occurs i e room pressure falls outside preset range a signal is triggered by the SRPM the green LED shuts off the red LED ashes and the audible alarm sounds The acknowledge button can be...

Страница 24: ...id warranty Be sure to include a brief description of the problem plus any relevant application notes Contact customer service to receive a return goods authorization number before shipping CLEANING I...

Страница 25: ...1 General Requirements Canadian electrical code Part 1 CAN CSA C22 2 No 0 4 04 Bonding of Electrical Equipment CAN CSA C22 2 No 61010 1 04 Safety requirements for electrical equipment for measurement...

Страница 26: ...26 8 0 LOCATION OF COMPONENTS AND ACCESSORIES...

Страница 27: ...27 9 0 MENU TREE...

Страница 28: ...repaired or altered by anyone except SETRA or its authorized service agencies c the serial number or product code has not been removed defaced or otherwise changed and d examination discloses in the...

Отзывы: