SHANGHAI SERMATEC ENERGY TECHNOLOGY CO.,LTD
- 57 -
exported to Excel tables.
Figure 21.
Figure 21
8.7 Warning
Warning management is divided into activity warning and history
warning. An active warning can reflect in real time whether the
system now has a warning message. Historical warnings record all the
warning information that has occurred in the system, including the
type, level, description and time of the warning.
Figure 22, Figure
23.
Figure 22