SHANGHAI SERMATEC ENERGY TECHNOLOGY CO.,LTD
- 42 -
please follow the following five safety rules to ensure the safety of
operators:
•
Disconnect all external connections to the energy storage system.
Ensure that the energy storage system is not accidentally recharged.
•
Use a multimeter to ensure that the energy storage system is
completely uncharged.
•
Perform necessary ground and short circuit connections.
•
For adjacent potentially live parts of the operating part, using
insulating fabric for insulating cover.
7.2 Maintenance work and cycles
Scope of
examination
Method of examination
Maintenance
period
System running
state and
environment
•
Listen for abnormal
sound when the energy
storage converter is
running.
•
While the system is
running, check the
variables.
•
Check whether the
main device is normal.
•
Check whether the
incoming and outgoing
wind is normal.
One every six
months
System clean
•
Replace the air filter
Once every six
months (depends
on the dust
content of the use
environment)