SHANGHAI SERMATEC ENERGY TECHNOLOGY CO.,LTD
- 23 -
4.6.2 Other requirements
After the wiring is completed, the position of the inlet and
outlet holes shall be sealed with fireproof mud to prevent
mosquitoes from entering the cabinet.
4.6.3 Installation mode
After the energy storage cabinet is moved to the installation
position by forklift and other tools, the cabinet is moved to a
proper fixed position by fine adjustment, the front door of the
cabinet is opened, and the four corners of the cabinet are fixed
by taking out M10
×
80 expansion screws, as shown in Figure
4-3.
Figure 4-3
Position
Describe
A
N15OOmm Ensure that the front door of the
cabinet can be fully opened, enough cold air can
enter, and the user can easily plug and unplug the
module and operate the circuit breaker.
B
N1OOOmm Ensure that the back door of the
cabinet can be fully opened, ensure ventilation
and heat dissipation, and the user has enough
space for maintenance.
Screw
Spring washer
Flat washer