Figure 5 - Data Pro Assembly
5.0 Power Up
If the Data Pro is AC powered,
set the panel “On/Off” switch to “On”.
If the Data Pro is DC powered, turn on the DC power supply.
On the Data Pro,
set the panel “On/Off” button to “On”.
On power up, the system takes approximately 45 seconds to perform the boot-up process
and start the software application.
If the Data Pro is acting as a Modbus master with no gauge control, you should start seeing
data tabs for all connected devices within a few seconds.
If the Data Pro is using an FIC gauge interface, it will take approximately 1.5 minutes to
complete the power up process during which time a tab for each FIC will appear showing
the boot up status.
If the Data Pro is using an SPS gauge interface, it will take approximately 3 minutes to
complete the power up process during which time a tab for the SPS will appear showing the
boot up status
6.0 Data Pro
– Start Up Screen
The startup screen shown in
Figure 7
displays peripheral data in the first tab and gauge data in
subsequent tabs. The software performs the following key operational functions:
Logs gauge and I/O data.
Displays real-time and historical gauge and I/O data.
Orientation of Ribbon cable
observed by Red Strip
Panel PC Jumper
Placement on ‘SD Boot’