2 Operation Details
0
0.5
1
1.5
2
2.5
3
3.5
4
−0.5
0
0.5
Up Time [hours]
RxClkBias = t
Rx
−t
GNSS
[ms]
Figure 2-2:
Effect of clock steering on the clock bias (clock steering enabled at an
up time of 1 hour).
Clock steering accuracy is dependent on the satellite visibility, and it is recommended to only
enable it under open-sky conditions.
Bit 3 of the
CommonFlags
field of the
SBF block indicates whether clock steering
is active or not.
Note for the users of a GNSS constellation simulator:
When using a constellation simulator, and if the only simulated signals are the legacy L1 and
L2 GPS and GLONASS signals, make sure to set the simulation time after December 31, 2019.
The receiver time will be incorrect before that date.
For correct time determination, it is mandatory to reset the receiver before every (re)start of
the simulation.
2.4
Computation of Position, Velocity, and
Time (PVT Solution)
The receiver computes the position, velocity and time (PVT) based on the pseudoranges, the
Doppler measurements and, if applicable, the differential corrections.
The availability of the PVT depends on:
• the number of available pseudoranges and Doppler measurements, equal to the num-
ber of tracked satellites, or a subset of them as specified by the
command;
• the number of valid sets of broadcast ephemerides, which are needed to compute the
position, velocity, and clock bias for each tracked satellite;
• the number of valid sets of fast and long-term SBAS corrections and their age in the
case of SBAS-aided positioning;
• the number of valid differential corrections and their age in the case of DGPS/RTK po-
sitioning.
A position fix requires a minimum of 4 tracked satellites with associated ephemerides. When
a PVT solution is not available, PVT-related SBF blocks are still output with all the numeric
fields set to Do-Not-Use values, and with the
Error
field set to indicate the source of the
problem.
61
Содержание PolaRx5TR
Страница 1: ...PolaRx5TR Reference Guide Applicable to version 5 5 0 of the Firmware ...
Страница 73: ...3 Command Line Reference Chapter 3 Command Line Reference 73 ...
Страница 108: ...3 Command Line Reference COM1 gca Ch05 CR R gca Ch05 ChannelAllocation Ch05 G01 auto 0 16000 COM1 108 ...
Страница 130: ...3 Command Line Reference COM1 gim CR R gim IonosphereModel off COM1 130 ...
Страница 147: ...3 Command Line Reference PVTMode Static StandAlone SBAS DGPS RTKFloat RTKFixed Cartesian1 COM1 147 ...
Страница 218: ...3 Command Line Reference COM1 esoc COM1 MeasEpoch CR R esoc COM1 MeasEpoch SBFOnce COM1 MeasEpoch COM1 218 ...
Страница 237: ...3 Command Line Reference COM1 237 ...
Страница 251: ...3 Command Line Reference Event type Command etime 1588343730 before 1440 after 1440 Planned Disk DiskEvent COM1 251 ...
Страница 279: ...3 Command Line Reference COM1 279 ...
Страница 294: ...4 SBF Reference Chapter 4 SBF Reference 294 ...