Installation
5.4 Mounting on the switching panel
SENTRON PAC4200
System Manual, 09/2009, A5E02316180B-02
71
6.
Tighten the 4 screws evenly in the two brackets; tightening torque 0.3 Nm (Fig.
"Installation step D").
7.
When using the Ethernet interface:
–
Refer to the information about cable quality and connector design in the chapter
"Technical data".
–
Ground the shielding of the Ethernet cable at both ends of the cable. Refer to the
"Connecting" chapter for more information.
–
Ensure strain relief for the RJ45 connector.
Secure the Ethernet cable to the panel for this purpose. Fix the cable in position as
shown in the figure "Installation step E" at location (3) using a self-adhesive cable
clamp or other suitable small installation accessory.
8.
When using optional expansion modules:
–
insert the expansion module into the slots on the rear of the device. You can find the
installation instructions in the operating instructions of the relevant expansion module.
Installation is complete.
Figure 5-2
Installation step A, device with screw terminals
Содержание PAC4200
Страница 16: ...Introduction 1 6 Further documentation SENTRON PAC4200 16 System Manual 09 2009 A5E02316180B 02 ...
Страница 66: ...Operation planning 4 1 Operation planning SENTRON PAC4200 66 System Manual 09 2009 A5E02316180B 02 ...
Страница 174: ...Service and maintenance 10 6 Disposal SENTRON PAC4200 174 System Manual 09 2009 A5E02316180B 02 ...
Страница 284: ...Index SENTRON PAC4200 284 System Manual 09 2009 A5E02316180B 02 ...