Step 3
Then you can
see the inverter current running
standard code
on the settings page,
if it is not,
We can change the settings to AS4777.2 for Australia.
8. Maintenance
WARNING
Before maintaining and commissioning the PV inverter and its
peripheral distribution, switch off all the charged terminals of the PV
inverter, and wait at least 10 minutes after the inverter is powered off.
8.1 Routine Maintenance
Table 8.1
Maintenance checklist and interval
Check
Item
Check
Content
Maintain content
Maintenanc
e
Interval
PV inverter
receiving
Statistically
maintain
the
status
of
electrical yield, and monitor its abnormal
NA
Weekly